Chapter 3 of 9 · 9 min read
Projects
A project is an outcome that takes more than one step. Name what done looks like, keep a next action, and start fewer so you finish more.
Outcome, not activity#
In Getting Things Done, David Allen defines a project as any outcome that needs more than one action. The key word is outcome. "Spanish" is an activity that never ends; "Hold a 15-minute conversation in Spanish by June" is a project you can finish.
Activities that never finish (health, family, home, work) are areas, not projects. Overnight keeps them apart: areas live in Project settings → Edit areas… and group your projects and goals; projects live in Tasks → Projects and end.
A quick test: can you imagine the day you'd mark it Done? If not, it's an area, or a habit.
Starting one. In Tasks → Projects, New project asks for a name only: type it and press Enter. Its ▾ has the longer ways, every time:
- Step by step…: the name, Done when, an area and a template, in one dialog.
- From a template…: the same dialog with the templates open (see Templates).
You can also type ~Name when adding a task.
The four lines that make a project work#
Each project page opens with an overview. Four fields carry most of the value:
- Live at my domain, with three case studies and a contact form
- So applications can link to real work, not a CV line
- List the five projects I could show
- Work
- Fri 5 Dec
- Land a design role
- Done when: what's true when it's finished. Concrete enough that you'd recognise it: "The site is live at my own domain with three case studies", not "portfolio done".
- Why: why it matters to you. It shows when the project is set aside, so write it for the version of you who's lost the thread.
- Next action: the very next physical step. With none chosen, Overnight uses the project's first open task; with no open tasks, the field asks "What's the very next step?"
- Aiming for: a soft target date. It never turns red; when it passes, it reads "Was aiming for".
Area and Goals link the project into the bigger picture. A goal's page shows the projects that carry it (see Goals).
Worked example: launch a portfolio site#
Say you want a portfolio online before job applications open in spring.
- New project → ▾ → From a template…, pick Launch something and name it "Launch portfolio site". It adds three milestones: Shaped → Built → Shipped.
- Done when: "Live at my domain, with three case studies and a contact form."
- Why: "So applications can link to real work, not a CV line."
- Aiming for: six weeks from today. Area: Work.
- Under Shaped, add: "List the five projects I could show", "Pick three and write one line on each". Under Built: "Choose a template", "Write case study 1", … Under Shipped: "Buy the domain", "Ask two friends to click through".
- Next action: "List the five projects I could show". It's small, clear and doable tonight.
- Link it to your goal "Land a design role" with Link to a goal….
Each week, the weekly review asks how it's going. Week one: On track, dot on the uphill side. Week three: Needs attention ("case studies take longer than planned; cut to two?"). That's the point of a status: to make the decision visible early.
Milestones#
Milestones are checkpoints on the way: "First draft", "Booked", "Built". They split a long task list into stretches you can see the end of.
- Add milestone on the project page; give it a date if it has one.
- Drag tasks between milestone groups, or press Alt↑ / Alt↓ to move the focused task (it crosses into the next group at either end). The row menu also has Move to milestone….
- Tick a milestone's flag when you reach it. That small moment matters: Teresa Amabile's research on work diaries found that making progress on meaningful work was the strongest booster of motivation on a given day.
Status updates and the hill chart#
Post update records how a project is going in one line, with a health word: On track, Needs attention or Stuck. There's no red and no "off track", because the goal is honesty, not blame. "A line a week is plenty."
The optional hill chart comes from Basecamp's Shape Up. Work on anything has two phases:
Percent-complete misleads, because a task list grows as the real work appears. The hill asks a better question: are there still unknowns? A dot stuck uphill for two weeks is the most useful warning a project can give you. The fix is usually to find the unknown and make a small task to resolve it ("Call the council about the permit").
Fewer active projects, more finished ones#
The project list shows N of 5 active. Five is a default, not a rule; change it under Project settings → Active limit.
When you're at the limit, a new project suggests Someday instead. You can still tick Start it now anyway. Overnight never refuses you; it just makes the trade-off visible.
Why limit? Every active project competes for the same attention. Personal Kanban and Kanban generally rest on the same finding: limiting work in progress shortens the time each thing takes and increases how many get finished.
The shelves:
- Someday: ideas you're keeping, not doing. Treat it as an incubator, not a graveyard: look through it every few weeks.
- Paused: started, deliberately on hold.
- Done: finished projects, kept with their history.
Templates#
New project → ▾ → From a template… (any time, not only for your first project) gives a project its milestones (dated from today) and a few starter tasks. Everything can be changed after.
| Template | Milestones | Good for |
|---|---|---|
| Launch something | Shaped → Built → Shipped | A site, a product, a side project |
| Learn a skill | Basics → First real use → Comfortable | A language, an instrument, a tool |
| Plan an event or trip | Decided → Booked → Ready | Holidays, weddings, a conference |
| Home project | Planned → Done | A room, a repair, a clear-out |
| Write something | Outline → Draft → Out | An article, a talk, a report |
The weekly sweep#
The weekly review's Projects step walks through every active project. For each, ask:
- How's it going? Pick a health word, and move the hill dot if you use it.
- Is the next action still right? Update it if it's done or stale.
- Does it still belong in Active? Move it to Someday, or mark it Done.
That's GTD's core weekly move: every active project has a next action, and the list reflects what you're really doing. A project you haven't touched in three weeks is quietly on Someday already; making it official frees the attention it's holding.
Notes on the project page link Notebook days and notes: meeting notes, research, the premortem. Each opens with one click.
Sources#
- (2015). Getting Things Done: The Art of Stress-Free Productivity (revised edition). https://gettingthingsdone.com
- (2019). Shape Up: Stop Running in Circles and Ship Work that Matters (chapter 13: Show Progress). https://basecamp.com/shapeup/3.4-chapter-13
- (2023). The PARA Method: Projects, Areas, Resources, Archives. https://fortelabs.com/blog/para/
- (2011). The Progress Principle: Using Small Wins to Ignite Joy, Engagement, and Creativity at Work. https://hbr.org/2011/05/the-power-of-small-wins
- (2007). Performing a project premortem. Harvard Business Review. https://hbr.org/2007/09/performing-a-project-premortem
- (2011). Personal Kanban: Mapping Work, Navigating Life. https://www.personalkanban.com